Wedge Inserting Machine Armature Slot insulation Treatment
Armature parameter like slot number and the speed can be programmed on the screen.Under single action mode, user can insert insulation paper manually and act one slot. Machine will be under reset status after pressing single slot action.
(1)Feature
PLC control
Adjustable for different armature lengths
Quick and easy readjustment to other armature types
Precise wedge length control
Suitable for three shifts continuous production
Friendly designed operator's interface
Precise wedge formation and placement
(2)Specification
Wedge Shape | Flat, U or R shape |
Thickness of wedge | 0.2 mm ~ 2.0 mm |
Efficiency | 0.5~0.8sec/per slot |
Armature OD | 20-55mm |
Length of lamination | Max 60mm |
Shaft length | 32~250mm |
Shaft OD | 6~20mm |
Slot number | 8-24 slots |
Commutator OD | 16~50mm |
Air pressure | 4~6kg/cm2 |
Voltage | AC220V±10%, 50/60Hz |
Machine power | 1.0KW |
Weight | about 400Kg |
Dimension | 910 mm x 880 mm x 1300mm |
(3)Maintenance
1) In order to make sure the accuracy and duration, inject lubricating oil to all the moving parts every 12-15 days so as to reduce the abrasion and increase the efficiency. The moving parts has been marked 1~8 in the below picture. Besides the moving parts, the indexing transferring parts, paper forming parts, other transferring parts and bearing place are also need to be injected lubricating oil.
2) Clean the pressing wheel and discharge tooling by air gun regularly. Clean them from back to front so that the insulation paper comes out easily during operation.
3) Add anti-rust oil to the machine regularly if the environment is humid.
4) The machine frame is made of alloy metal so do not knock it firmly.
5) Clean the surface of the machine regularly.
Contact: Emily Gao
Phone: 17721374887
E-mail: emily@motor-machinery.com
Add: 609#, Building B, No. 2699,Youyi Road, Baoshan District,201900 Shanghai